Tag

transit

Browsing

Transit-first King St. pilot moves forward

Next week, Toronto’s executive committee will vote on the proposed King St. Pilot, the first plan to enact a transit-first mentality to city planning.

The King. St. Pilot is a direct response to slow transit service and increased congestion along the downtown corridor. “King Street is not currently working well for transit,” a report prepared by Toronto’s General Manager said. “Streetcar service can be slow, unreliable, and erratic, with unpredictable travel times, especially during rush hours, but also during some late evening and weekend times. People end up having to plan for their slowest trip.”

With more than 65,000 daily TTC riders compared to the 20,000 vehicle users along King St., re-branding this corridor as transit-first makes a lot of sense.The pilot will cover six kilometres of King St., from Jarvis to Bathurst. The corridor would funnel drivers to parallel east-west routes like Queen St., Richmond, Adelaide, Wellington, or Front, while still allowing local drivers to access the street for short periods of time.

Earlier suggestions of creating a car-free roadway were dismissed, as there are a number of driveways and parking garages that must be accessed from King St. However, city staff came up with a solution that would allow drivers to access King St. without bottling traffic.

Local residents may drive on King St., but only in between intersections. At each traffic sign, cars must turn left. It will be up to the drivers to decide how best to reach their destination. This will allow for significantly less cars on the roads and for the King. St. streetcars to have unobstructed access to their own lane.

King St. Pilot
Photo courtesy of City of Toronto.

Other features of the plan include dedicated pick-up and drop off areas and designated delivery areas. There will be no dedicated cycling lanes.

The last reported cost for this project was estimated to be at $1.5 million, but it has since been determined the project is eligible for funding under Phase I of the Public Transit Infrastructure Fund. This means it’s possible to get 50 per cent of funding from the federal government, leaving the city to come up with the remaining 50 per cent.

The Toronto Transit Commission will vote on the pilot program prior to the executive committee vote. If all goes well, it will be discussed in the July city council meeting.

What do you think of the King St. Pilot? Let us know in the comments below!

John Tory calls for provincial funding for relief line

Toronto Mayor John Tory did his best not to grimace at Friday’s joint federal-provincial-municipal press conference on the Yonge Relief Line.

For what seemed the millionth time, three levels of government “re-affirmed their commitment” to this important transit project without actually promising dedicating funding. In fact, in what was an awkward turn of events, Ontario Transportation Minister Steven Del Duca took his time at the podium to outline the province’s previous transit commitments and gush about the government’s contributions to Toronto.

Afterwards, Tory took the podium and said “investing in transit is not work that can ever be considered complete.” He called on the province and the federal governments to each contribute 40 per cent of the funding needed to build the relief line. With federal and provincial representatives standing at his side, he said this commitment was necessary and Toronto wasn’t going to take no for an answer.

The federal representative, Ahmed Hussen, the Minister of Immigration, Refugees and Citizenships, who was there on behalf of the Minister of Infrastructure and Communities, pledged his support for the relief line. Hussen talked about the $27 million the federal government has already promised to this project and said more is on the way as part of an 11-year, $81 billion infrastructure plan.

“This investment will not have a real and lasting impact for Canadians unless the province is involved,” Tory said in a statement. “While the Province of Ontario has invested $150 million to help plan the Relief Line, and we thank them for that, we need them to commit to partnership on the construction of this transit project and the continued expansion of our network across Toronto.”

“I’m asking for a steadfast commitment from the Province that they will be financial partners in the building of the Relief Line.”

It seems like even after all of this discussion — Toronto is in the same place it was before. The mayor is fighting for funding after being refused the right to raise it on his own with tolls. The province is in denial, saying they have already provided enough money. And the federal government is saying they will help, but won’t give an exact number just yet.

It looks like Toronto’s Mayor has a bit more fighting to do.

Will the province step up to fund the relief line?

Toronto Mayor John Tory is doing his best, but it doesn’t seem to be enough to convince his fellow members of council, the province, and the federal government of the basic facts — the relief line is necessary.

The mayor’s pleas seem to rest on deaf ears. While city council did push forward the preferred alignment for the Yonge Relief Line, the actual construction of this much-needed transit project is still years away. In fact, it will never be built unless the province and the federal government step up.

The problem is that politicians are too wrapped up in the next election to do what needs to be done today. Experts all agree the relief line must be built prior to 2031 when the TTC Line 1 reaches capacity. With other subway extensions and Go Rail projects bringing more people into the downtown core, the relief line becomes even more of a necessity.

And yet, the provincial government hasn’t committed to more than $150 million for the planning of the relief line.

Toronto knows the relief line is going to be expensive. With a current price tag of $3.6 billion, it’s all city councillors can talk about.

Tory came up with a possible solution early on — revenue tools. Instead of raising property taxes, he would support the tolling the Don Valley Parkway and the Gardiner Expressway. The money collected from these tolls would be dedicated towards transit. But, the province said no.

In addition to denying Toronto the ability to make money off of their own roads, the province said they would not be putting any new money into municipal projects for two years. This is a big blow to Toronto and an obvious election tactic on behalf of the Kathleen Wynne government in hopes of gaining support from the 905 communities.

What the province is forgetting is the universal benefits of a relief line. Those living in the 905 area may be able to get into the GTA thanks to the subway extensions and rail lines, but once they get here they will be trapped in the same congestion and gridlock as the rest of us. Revenue tools like tolls would be the perfect solution — drivers will pay to help support transit infrastructure so that those who do use public transportation get better service. Those drivers will then experience less congestion on major roadways.

It’s a win-win; or it would have been if the province approved it.

Without these revenue tools or financial support from both provincial and federal governments, the chances of the relief line being built by 2031 is incredibly low. Toronto needs the province to step up and put politics aside.

If the province won’t let us toll roads, then they have to give us funding for the relief line. Toronto’s mayor shouldn’t have to stand at subway station handing out leaflets to get the government’s attention, only to be scolded by the Minister of Transportation for doing his job. This project is too important for such silly and juvenile politics.

Toronto has waited about 100 years for the relief line. Do we need to wait another 100 before someone decides to be an adult and pay for this thing?

The B.C Green Party finally puts on their big boy pants

The British Columbia provincial election results have shocked Canadians across the country. The B.C. Green Party has never-before-seen political leverage after the closest election results on record.

The final seat count as of May 24 revealed the Liberal party has 43 seats, the NDP has 41 and the Green Party has three seats in the legislature. The Liberals won by a mere 1566 ballots after very narrow results forced a vote recount, leading many people to question whether the election should be recast entirely. The election results have also put the Green Party in a strong position. Green Party Leader Andrew Weaver has been approached by both the Liberal and NDP parties to strike a possible coalition and is currently in discussions to decide which party to support, or to not support either party at all.

According to Weaver, the final decision on a potential coalition government will be announced by Wednesday May 31. For the first time in Green Party history in Canada, the classic underdog that champions the environmental movement is in a politically powerful position. The Green Party has the opportunity to have certain demands met by either the Liberals or the NDP government to help form a coalition government in B.C.

On Tuesday, a coalition of activists joined together to assemble in front of the B.C. Legislature buildings to try and convince the NDP and the Green Party who have always been at odds with each other to join together and end 16 years of Liberal rule in the province. Dethroning Premier Christy Clark would be in the best interests of the province from an environmental standpoint. Clark has repeatedly approved devastating environmental projects, including the expansion of the Kinder Morgan Pipeline and supporting the Site C megadam project.

Clark did not speak when the final election results were announced on Wednesday, but issued a statement saying, “”with 43 B.C. Liberal candidates elected as MLAs, and a plurality in the legislature, we have a responsibility to move forward and form a government.” The Green Party will play a big part in what type of government is formed in coming weeks.

This is a key moment in Canadian politics for the Green Party in B.C. An opportunity to actually make a difference and have political weight in legislature. It is also a crowning moment for Green supporters everywhere who have toiled for years being the underdog and finally have a chance at affecting meaningful change in Canada’s most environmentally progressive province.  Canadians everywhere wait on the edge of their seats to see what move Weaver makes, and whether the NDP and Green Party can finally put their differences aside and dethrone Clark once and for all.

What do you think will happen? Let us know in the comments below!

Toronto city council approves relief line alignment

Toronto City Council voted to approve the Carlaw alignment for the southern section of the Yonge relief line, but not before a lot of debate that proved councillors still don’t understand the necessity of this incredibly important project.

Councillors threatened to hold off this project if their transit project of preference, made generalized statements about how little relief the “relief line” will have in their riding, and argued about the price tag attached.

As the province of Ontario moves forward with high-speed rail connecting Windsor to Toronto and a transit line that connects northern 905-ers to Finch, there has been little provincial support offered for the relief line.

The relief line is necessary if the city of Toronto wants to relieve congestion and unlock gridlock on major roads. It becomes even more necessary as these other transit lines are built to connect to the already overcrowded Line 1.

City staff have already said that Line 1 will be at capacity by 2031. At this moment, if councillors, staff, and the province keep bickering, it doesn’t seem like the relief line will be built by then. In fact, Toronto Mayor John Tory sent a letter to Toronto Transit Commission CEO Andy Byford asking for creative solutions to address short-term subway capacity issues.

“I want to make sure we are doing everything we can now to make the ride better for riders,” Tory wrote.

Meanwhile, the provincial government is still refusing to contribute to the relief line. In a statement released as a response to Tory’s press conference Wednesday morning, Steven Del Duca, Minister of Transportation, released a statement saying they have already pledged $150 million towards the planning of the relief line and have been an active partner in Toronto’s transit planning.

They have not committed any further funding towards the building or design of the relief line, and have indicated that the province will not be making further commitments for another two years.

Tory, on the other hand, is saying that the province needs to step up and commit to helping fund the downtown relief line, especially since the Kathleen Wynne government shut down his plan to toll the DVP and Gardiner Expressway for dedicated transit funds.

“I’m not asking for a blank cheque,” Tory said. “I’m asking for a commitment.”

The relief line alignment passed 42-1. Amendments to the original motion include an exploration into cost-sharing for the Yonge extension and the promise that the Yonge North subway won’t open unless the relief line is built and funding is made available.

We can’t have high-speed rails without a relief line

Ontario Premier Kathleen Wynne announced Friday the provincial government will invest $15 million in a high-speed rail line that will eventually connect Toronto to Windsor, cutting down travel time from four hours to two hours.

“Building high speed rail along the Toronto-Windsor corridor isn’t just a game changer for Southwestern Ontario — it’s going to deliver benefits all along the line,” Wynne said in a statement. “Whether it means accepting a job that previously seemed too far away, visiting family more often, or having ready access to the innovators who can take your business growth to the next level — high speed rail will make a real difference in people’s lives and drive economic growth and jobs.”

The project, estimated to cost about $19 billion in total (if the trains run 250 km/hr), will travel through Guelph, Kitchener-Waterloo, London, and Catham, with a connection to the Toronto Pearson Airport. The $15 million investment is for a comprehensive environmental assessment.

Provided by MTO

 

The 2017 budget included a small mention of funding being provided to RER, but the $19 billion price tag is a bit of a surprise, especially considering the lack of support for municipal projects that should be built prior to this high-speed rail line.

While connecting Southern Ontario to Central Ontario has its advantages, it’s only going to cause increased overcrowding on Toronto’s transit system. Presumably, the people working and visiting in Toronto’s downtown core won’t all be heading to locations around Union Station or Pearson Airport, meaning they will have to use the TTC to get around. Considering Line 1 will be at capacity by 2031 — the same time the high-speed rail is supposed to be completed — it would be wise for the province to invest more funds in the downtown relief line before promising funds for high-speed rail.

Without a relief line, commuters in Toronto will suffer from these connecting high-speed lines. Connecting the cities in this corridor would absolutely benefit businesses and commuters throughout Ontario— but if those commuters get stuck as soon as they get in Toronto, what’s the point?

The province hopes to have high-speed trains up and running from London to Toronto by 2025, and from London to Windsor by 2031. The provincial government will be looking at alternative financing options as well as public-private partnerships to fund the rest of the rail line.

What do you think about this investment? Let us know in the comments below!

King St. Pilot makes transit the priority

Thursday, the Toronto Transit Commission (TTC) and city staff made their second presentation on the King St. Pilot, a plan that will hopefully alleviate congestion along the car-heavy corridor to make it more transit-friendly.

“What we are trying to do here is to improve transit service for the 65,000 passengers on the busiest transit route in the city,”said Jacquelyn Hayward Gulati, Director of Transportation Infrastructure Management with the City of Toronto. “That’s three times as many drivers who use the corridor. We are trying to move the most people the most efficient way.”

The pilot will cover six kilometres of King St., from Jarvis to Bathurst. The corridor would funnel drivers to parallel east-west routes like Queen St., Richmond, Adelaide, Wellington, or Front, while still allowing local drivers to access the street for short periods of time.

According to Gulati, making King St. completely car-free would take immense resources, as there are driveways and parking garages that can be accessed from that corridor. Instead, city staff has designed a plan allowing local residents to drive on King St., but only between intersections. These vehicles must turn right at the next traffic signal. Physical barriers will be used to prevent vehicles other than the streetcars from passing through the intersection.

There is also going to be designated spaces for short-term loading, deliveries, and taxis, something business owners indicated was a necessity.

Photo courtesy of City of Toronto.

“People will access the section of King that they need to access for their local trip,” Gulati said. “We are looking to have the amount of mixed traffic dialled down to such an extent that we expect to see streetcar improvements, but it is a pilot project and that’s what we want to learn from this.”

Cyclists, transit users, and emergency vehicles would be the only commuters allowed to cross intersections. However, there would be no dedicated bike lanes.

This particular corridor between Bathurst and Jarvis was chosen because it has the worst transit service on King St. The goal of this pilot would be to see additional improvements in reliability, speed, and capacity on the King St. streetcar — more people walking or using transit and less people driving.

The estimated budget level cost is $1.5 million, but that is bound to change once the design has been finalized after Thursday’s public meeting.

If all goes well, a final report will be presented at a June TTC board meeting and then will be sent to approval by City Council in July. The plan is to be able to implement the King St. Pilot by the Fall of 2017 or Spring 2018.

What do you think of the King St. Pilot? Let us know in the comments below!

Relief line alignment moves forward to council

Executive Committee voted to move forward the Relief Line and the Yonge Subway Extension for city council approval.

Next week, city council will vote to approve the Carlaw alignment for the Relief Line and move to start the “Transit Project Assessment Process.” The alignment for the southern section of the relief line will travel down Carlaw from north of the Go tracks at Gerrard Ave. to Queen St. East.

Council will also vote on advancing the planning and design of the Yonge Subway Extension.

The discussion about these two transit projects began with statements by York Region chair Wayne Emmerson, Makham Mayor Frank Scarpitti, and Richmond Hill Mayor Dave Barrow. Each city leader pledged their support for both the Relief Line and the Yonge North Extension and they be built concurrently.

The support for the relief line being built concurrently with the North Extension is significant since the extension will bring more people from the GTA into the downtown core and Line 1 is nearing capacity. Without the relief line, those new transit users won’t be able to use to get on the subway once they enter the city.

City councillors were given the opportunity to ask questions of the York region representatives, including joint-funding and their decision to oppose the creation of tolls, which would have provided much-needed revenue towards these projects. Markham Mayor Frank Scarpitti spent most of his time at executive committee praising the provincial government for providing starting funds for both transit projects, despite the fact the amount is minimal. Toronto Mayor John Tory emphasized that it will take all three levels of government to move these projects forward, saying there is a distinction between funding for the planning of a project, and the construction of a project.

In the end, everyone agreed that more funding is needed for both the relief line and the Yonge Extension. This decision is a far cry from Tory’s threat last week to withdraw his support for the Yonge Extension unless the province provided more funding for the relief line. It appears as though Tory made a deal with the York mayors that he will support the extension if they publicly support his bid for the relief line.

A few amendments were added to the original report before it passed, including a cost-analysis of the northern section of the relief line and the renaming of that section as the “Don Mills Line”.

City Council will be held on May 24 at city hall.

Metrolinx signs contract with Alstrom as backup to Bombardier

Metrolinx announced Friday they have entered into a contract with Alstrom, a French transit agency specializing in integrated systems, to build 17 vehicles for the Finch West LRT project as well as 44 backup trains for the Eglinton Crosstown.

“We know for sure that Alstrom’s light rail vehicles work. They are currently producing quality vehicles on-time for Ottawa’s Confederation Line LRT Project,” a statement released by Metrolinx President and CEO John Jensen said. “We are going through a dispute resolution process with Bombardier but that could take 8-12 months, and we can’t wait that long to determine whether Bombardier will be able to deliver.

The vehicles were meant to be backups in case Bombardier is unable to deliver their trains on schedule. Metrolinx has been in a continuous legal feud with the Montreal-based agency. If Bombardier fulfills their contract for the Eglinton Crosstown and the 44 vehicles built by Alstrom aren’t needed, they will be reassigned to the Hurontario LRT project.

The contract was awarded for $529 million and includes an option for additional vehicles once the original 61 are built. The specific vehicle — the Citadis Spirit — was specifically designed for the Canadian market and can withstand winter conditions up to -38 degrees. Alstrom will also be providing Metrolinx with a new control centre to integrate the Go Transit network and a new signalling system for the Union Station Rail corridor, among other things.

“We are proud to continue our collaboration with Metrolinx as it seeks to link communities and deliver advanced public transit solutions to the greater Toronto area, and we are honoured by their renewed confidence in our products, solutions and teams,” said Angelo Guercioni, Managing Director of Alstom Canada, in a statement.

Alstrom has sold over 2,300 of these trains to 50 cities around the world.

NDP calls on Kathleen Wynne to fund relief line

BREAKING: NDP transit critic Cheri DiNovo calls on Ontario Premier Kathleen Wynne to commit to funding the relief line.

“The Mayor of Toronto and the TTC say that the relief line must be built before the Yonge line extension, or else there will be transit chaos,” she said in a statement. “But the premier seems to be more interested in saving Liberal seats north of Toronto than funding a subway project that transit experts say must come first.”

This statement was released on May 11, two days after Toronto Mayor John Tory said he would remove his support for the Yonge North Subway Extension unless the province supplied funding for the relief line. The Relief Line will provide an alternative for commuters travelling downtown from the west end of Toronto, rather than continue to funnel Torontonians into the singular central Yonge Line 1.

Line 1 will be at capacity by 2031.

More to come.